There wasn’t much time available for Healey work again this weekend. I did install some more Dynamat product over the interior floorboard and the propshaft tunnel. I was then able to glue the black interior vinyl around the handbrake bracket on the tunnel.
I then installed my rechromed handbrake lever and its mechanism including attaching the cable to the lever and to the bottom of the floor pan to keep it from fouling the propshaft.
Using contact cement, I glued the foam rubber seal to the bottom of the boot in preparation for the fuel tank fitment.